Gallery
From the bay.
Scroll the story. Then the film. Then pull the tint across.
Bay
01
In the bay.
LED tunnel. Tiled floor. One standard.
Unit
02
The shop.
Wrap Academy London. Brick, shutter, livery.
Machine
03
765LT.
Dihedral door up. 99 on the beam.
Process
04
Film on.
Heat gun. Ladder. Backing in the bin.




Tunnel
02
Phone clips. Kept vertical.
03 / Selected work
The work
speaks.
Fresh finishes. Close-up details. A look inside the workshop.
Scroll through the collection →
Work
01 / 27


Bay note
LED tunnel. Tiled floor. One standard.


On this car
Rears tinted. Film on the paint. Same morning, same bay.


Bay note
Dihedral door up. 99 on the beam.


On this job
Heat gun. Ladder. Backing in the bin.
Hands and a squeegee on rear glass, film halfway across, water beading at the edge. Close enough that the blade and the fingers fill the frame. This is the shot that proves it is a trade and not a car park.


On this car
Rear glass done. Fronts left legal.





Tint / 05
Pull the film across.

